"Golden ring" hotel enlargement

Project number: 11

Status: project

Client: "Zolotoye koltso" hotel

Address: 5, Smolenskaya str. Moscow, Russia

Indicators: Site area : 0,21 Hа, total area: 29 623 м²

Appointment: 2003

Completion: 2003

Architects: V.Plotkin, I.Deeva, A.Borodushkin, D.Kazakov, A.Logvinova, A.Romanova, M.Shershova, N.Anokhina

Engineers: N.Aleshina, V.Andreev, V.Shishkin

The design of the enlargement of the “Golden ring” hotel proposes constructing a supplementary 12-storey building to the main hotel. The first underground floor will accommodate a laundry room, technical premises of the hotel, a car park and a car lift. Three other underground floors will host a car park. The ground floor will host the main entrance hall, hotel reception point, cloak room, restaurant, several mini-shops and a landing stage.  The main stairs and elevator lead from the ground floor to the vestibule of the first floor where are located several multifunctional halls. A gym and a wellness centre are situated on the 11th and 12th floors. All floors of the hotel that are above ground, except the 12th, are connected to each other by 4 passenger elevators.